kubernetes: [Failing Test] integration: scheduler_perf

Which jobs are failing?

ci-kubernetes-integration-master

Which tests are failing?

k8s.io/kubernetes/test/integration: scheduler_perf

=== RUN TestScheduling/TopologySpreading/500Nodes

Since when has it been failing?

https://prow.k8s.io/view/gs/kubernetes-jenkins/logs/ci-kubernetes-integration-master/1828486267961085952 08-26

Testgrid link

https://testgrid.k8s.io/sig-release-master-blocking#integration-master

Reason for failure (if possible)

 contexthelper.go:69: 
        WARNING: test suite deadline (2024-08-27 18:38:17 +0000 UTC) is close, need to clean up before the 5s cleanup grace period
    scheduler_perf.go:1159: FATAL ERROR: op 5: error in waiting for pods to get scheduled: at least pod measure-ns-0/affinity-pod-zjnkk is not scheduled: context canceled
{"level":"warn","ts":"2024-08-27T18:38:13.667260Z","caller":"embed/serve.go:160","msg":"stopping insecure grpc server due to error","error":"accept tcp 127.0.0.1:44287: use of closed network connection"}
{"level":"warn","ts":"2024-08-27T18:38:13.667415Z","caller":"embed/serve.go:162","msg":"stopped insecure grpc server due to error","error":"accept tcp 127.0.0.1:44287: use of closed network connection"}
panic: test timed out after 10m0s
running tests:
	TestScheduling (10m0s)
	TestScheduling/SchedulingRequiredPodAffinityWithNSSelector (11s)
	TestScheduling/SchedulingRequiredPodAffinityWithNSSelector/10Nodes (11s)

goroutine 2711122 [running]:
testing.(*M).startAlarm.func1()
	/usr/local/go/src/testing/testing.go:2366 +0x385
created by time.goFunc
	/usr/local/go/src/time/sleep.go:177 +0x2d

Anything else we need to know?

No response

Relevant SIG(s)

/sig scheduling

About this issue

  • Original URL
  • State: closed
  • Created 2 years ago
  • Comments: 25 (25 by maintainers)

Most upvoted comments

That’s a different 10 minute timeout.

I’m referring to this:

WARNING: test suite deadline (2024-09-06 09:22:29 +0000 UTC) is close, need to clean up before the 5s cleanup grace period

That is based on the deadline in the testing.T, which in turn is derived from the go test -timeout parameter.